Home › Gallery
The work. Up close.
Every photo here is our own work on a real jobsite, and each set runs in build sequence rather than in whatever order the camera roll came back. There is no stock photography on this site — if we did not install it, it is not pictured.
Selected field photography
North High School Addition
Courtyard exterior and panel detailing
Architectural exteriors
Selected views from the Fisher Xteriors project photo library.
Below-grade waterproofing
A foundation wall, from application through to the last look anyone gets at it.
Elevated garage slab
Surface preparation and waterproofing ahead of a traffic coating system. Nearly every coating failure we get called out to look at started here, before anything was applied.
Expansion control
Where the building is allowed to move.
Wall assembly
Air barrier, attachment, cladding — in the order they go on, and the reason we would rather carry all three.
Resinous flooring
Outdoor kitchen and patio
One residential project, start to finish — concrete, retaining wall, cedar, and the landscaping that closes it out.
